Process Considered Control Measures Ingredient Ounces Last 10 Samples Size N 5 Taken Popul Q29513927
A process that is considered to be in control measures aningredient in ounces. Below are the last 10 samples (each of size n= 5) taken. The population process standard deviation is 1.36.
SAMPLES
1
2
3
4
5
6
7
8
9
10
11
14
13
11
12
9
9
12
8
10
10
12
8
11
10
11
10
15
8
13
9
13
11
12
9
8
10
8
12
10
10
13
9
10
12
11
7
11
13
7
11
12
8
10
10
10
8
7
8
12
a) Standard deviation of the sampling means = ___ ounces (round yourresponse to three decimal places)
b) Withz = 3, the control limits for the mean chart are:
UCLx = ___ ounces (round your responseto three decimal places)
LCLx = ___ ounces (round your responseto three decimal places)
C ) The control limits for the R-chartare:
UCLR = ____ ounces (round to threedecimal places)
LCLR = ___ ounces (round to threedecimal places)
c) Based on the x-chart, is one or more samples beyond the controllimits? YES OR NO?
d) Basedon the r-chart, is one or more samples beyond the control limits?YES OR NO?
Leave a Reply
Want to join the discussion?Feel free to contribute!